I met with Shiva regarding electrical permission for AC installation.
I met with Mike Green, the inspector. He informed me that a sprinkler was never installed in the garage of unit 4. The only sprinkler shown in the report is inside of unit 4.
He also suggested putting a hanger in every 3 feet of two loose pipes in unit 4 garage.
I met with Mike Green, the inspector. He informed me that a sprinkler was never installed in the garage of unit 4. The only sprinkler shown in the report is inside of unit 4.
He also suggested putting a hanger in every 3 feet of two loose pipes in unit 4 garage.